FEASIBILITY STUDIES OF POWER PLANTS

FEASIBILITY STUDIES OF POWER PLANTS CONDUCTED BY KHARKOVENERGOREMONT

 

1.

Performance of a complex of works and services at “Obra” TPS, India

India

55

Coal

2006

Project Process part analysis and development of time-schedules, diagrams, and methods of testing and commissioning performance on those grounds

2.

Rendering of a complex of services at JSC “Tbilissy HPP”, Georgia

Georgia

2*160

Gas

2006

Technical counseling during operation of equipment of power units of 160 MW capacity

3.

Rehabilitation of unit No. 9 at Tbilissi Thermal Power Plant (TPP)

Georgia

300

gas, mazut

1999

Provision the Customer with the materials for preparing tender proposal

4.

Rehabilitation of two units at TPP “Ghorasal” by order of TPE, Russia

India

2 х 50

gas, mazut

1999 – 2000

Performing flaw detection and provision the Customer with the materials for preparing tender proposal

5.

Rehabilitation of five units at TPP “Obra” by order of TPE, Russia

India

5 х 50

coal, mazut

2000 – 2001

Performing flaw detection and provision the Customer with the materials for preparing tender proposal

6.

Inspection of the turbine and generator of unit No. 4 TPP “Ramin”

Iran

300

gas

2001

Post-repair inspection for controlling the quality of    the performed repair works

7.

Reconstruction of district boiler house in Kabul city for further construction of power plant.

Afghanistan

24

oil

2003

Provision the Customer with the materials for preparing tender proposal

8.

Rehabilitation of Hydro Power Plant “Darunta” and “Puli Khumri”

Afghanistan

2 х 12

water resources

2003

Provision the Customer with the materials for preparing tender proposal

9.

Construction of power unit at TPP “Siddhirganj”

Bangladesh

200

gas

2003

Provision the materials for the Consortium

10.

Rehabilitation of HPS “Naglu”

Afghanistan

84

water resources

2003

Provision the Customer with the materials for preparing tender proposal

11.

Inspection of power unit No. 3 at TPP “Guddu”

Pakistan

200

gas, mazut

2003

Performing flaw detection and provision the Customer with the materials for preparing tender proposal

12.

Rehabilitation of 110 kV power transmission line Kabul – HPS “Naglu”

Afghanistan

-

-

2004

Performing flaw detection and provision the Consortium with the materials for preparing tender proposal

13.

Scope of services at SE «PC «A.M. Makarov South Machine Works» CHP

Ukraine

 

 

 

Working out of operation documentation on modernization of the turbo set АП-25-2 st. No. 2 for operation with decreased pressure in controlled extract 2-4 atm.

 

We look forward to effective cooperation in the field of engineering, assembly and repair of power-generating equipment.

Our specialists are always ready to come to you to carry out preliminary inspection and make