MAJOR ACTIVITIES PERFORMED BY THE TURBINE DEPARTMENT:

• Installing, repairing, retrofitting, revamping and adjusting turbine units and their auxiliary equipment;
• Standard and specialized repair for all types of steam, hydraulic, driven and gas turbine units with warranty for work performed;
• Major overhaul, testing and adjustment for automatic governing and steam distribution systems for various types of turbines;
• Supplying equipment and spare parts for turbine machinery;
• Major overhaul and adjustment for all types of pumps, manufacturing and repairing heat exchangers and other equipment on-site or at the company’s industrial yard.

SPECIAL ACTIVITIES PERFORMED BY THE TURBINE DEPARTMENT:

• Replacing rotor blades for 6 MW to 1000 MW turbines, followed by machining and balancing the rotors
• Analyzing and removing increased vibration of turbine units and all rotating machinery, dynamic balancing for rotors in their own bearings, vibration control for turbine generators.

Repairing turbines is one of the core activities carried out by KHARKIVENERGOREMONT-HOLDING. Only for the years 2021-2023 the specialists from the Turbine Department performed and continue to perform repair work of varying degrees of complexity for more than 10 turbines of 25 MW to 1000 MW power units at various power plants (Khmelnytskyi NPP, Zmiivska TPP, Trypilska TPP, Burshtynska TPP, Cherkasy CHP, Kherson CHP, Bila Tserkva CHP, CHP of Kamet Steel Works and others).

In the years 2020-2021, a new 260 MW DST-S20-6CD2R turbine manufactured by Doosan Skoda Power was installed at Lidio Ramon Perez TPP, the Republic of Cuba.

In 2017, the back-up low-pressure rotor of the K-200-130 LMZ turbine at the Estonian power plant was repaired with the rotor being transported to Ukraine and back to Estonia.

In 2016-2017, our company performed a major overhaul of the K-210-130 LMZ turbine and all auxiliary equipment at Unit 5 of Ghorashal TPP, Bangladesh, which was the first such overhaul after the unit was commissioned in 1989. Once overhauled, the turbine definitely reached its maximum capacity of 210 MW.

Our company also performed various sophisticated projects to repair the K-500-240-2 turbines at Ekibastuz SDPP in Kazakhstan, to repair the K-300-240 turbine at Ramin TPP in Iran, to overhaul the Chinese N 210130 Harbin turbine at Jamshoro TPP in Pakistan, to revamp and retrofit the turbines at Units 1 and 2 at Obra TPP in India, and to repair the K-300-240 and VK-100 turbines in Vietnam.

Furthermore, our company has a very close relationship with Ukrainian Energy Machines Joint Stock Company Turboatom, Poltava Turbo-Mechanical Plant and other manufacturers and suppliers of turbine spare parts, so we can provide our customers with comprehensive repair services, complete with the supply of the appropriate spare parts.